On Saturday July 18th, Union Pacific (UP) will install a new cantilever at the W. Main Street crossing. The crossing will remain open to through traffic. The eastbound lane will be closed during this time, and flaggers will manage traffic flow through the rail crossing. The work is scheduled for Saturday 7/18 from 8:00 am to 6:00 pm.
Questions can be directed to the City of Watertown Public Works Department at (920) 262-4060. Motorists are encouraged to use caution when traveling near the work zone and consider alternate routes when possible.

